The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential cracking in the floor...
We had a customer that called us with unleveled concrete in front of the house. It was by the stairwell where their kids would be playing basketball and playing outside with...
A beach boardwalk (at grade) was proposed at Gray’s Lake Park within the area between the Raccoon River and Gray’s Lake. The ADA compliant boardwalk would...
Buzzard Billy’s Restaurant was moving to a freshly renovated building north of the downtown area of Des Moines. The building ’s original location was in the Court...
The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and an exterior beer garden patio...
The 11-story Fleming Building in downtown Des Moines was built in 1909. The lowrise building was constructed as a steel rigid frame with a brick and granite façade....
There were some serious foundation issues, so bad on one wall that braces and anchors could not repair the damage that had been done. In addition to the irrepairable damage...
Our system designer Eric was on what was thought to be just another foundation call only to find that the driveway of a house was about to collapse into the house! The driveway...